Lock out and tag out all power to the elevator before entering the hoistway or pit
ContextBefore any physical inspection begins, trip the main disconnect switch at the machine room panel and apply a personal LOTO (lockout/tagout) device. Verify zero-energy state by attempting to call the car — confirm nothing moves. This is not optional: accidental car movement in a hoistway has caused fatalities. If you are a homeowner accompanying a technician, never touch any controls until the technician gives explicit clearance. ASME A17.1 requires LOTO procedures for all maintenance and inspection work on elevator equipment.

